How to glue solid parquet flooring directly to a concrete slab.
Flooring installation delayed for slab to dry.
Too much humidity is most likely to be a problem for a newly installed slab but it could also be an issue for existing slabs too.
Add about 10 to that number to account for any possible mistakes and warped boards.
If you have a vinyl floor you may be able to install your flooring directly on top of it.
More time was needed for the concrete to dry.
Laminate flooring is a good alternative to wood flooring in basements.
Dry slab concrete slabs whether new or existing must be dry before the subfloor is installed.
When inexperienced contractors dry the walls and contents concrete floors are often assumed to be dried.
For best results several areas of each room should be tested for excess moisture.
Multiply length times width of the room.
For a standard four inch thick concrete slab this takes four to five months to happen naturally.
The use of an electronic concrete moisture meter to determine slab moisture emission is not reliable nor recommended.
Supplied with accurate knowledge of a slab s rh condition the general contractor and flooring installer will know whether to allow for more drying time to reach adhesive flooring specifications or to choose a different flooring adhesive flooring product which is compatible with the slab s current conditions.
Typical ceramic tiles are a common sight in many homes but some homeowners choose to install parquet flooring as an alternative.
However proper concrete floor water damage repair presents unique challenges.
Therefore it s important to allow concrete to dry out before you install flooring on a newly poured slab.
If the testing indicates a wet slab document the results and delay installation of the flooring until corrected.
The concrete slab needs to be dry before any flooring can be installed.
People then proceed to restore their room and add new flooring.
Not too soon after they start to have problems with the new flooring and claim it is defective.
When conducting slab moisture testing conduct tests in several areas regardless of the age of the slab.
Laminate flooring is also fairly easy to install.
If it s left uncovered water vapor can rise through the slab and evaporate away at the surface.
Determine how much flooring and materials will be needed.
Prior to installing the flooring we did our due diligence by performing a relative humidity rh test on the concrete which involved inserting an rh probe to a depth of 40 in the slab.
The slab can be tested to check the moisture levels and determine whether there is too much moisture to install the subfloor.
If tests indicate too much moisture is in the slab do not install hardwood floors.
Remove any carpet or other flooring.
The results indicated the floor was too wet to safely install flooring.