The easiest way is with a straight.
Floors checking for high low spots concrete.
If you place one end of the level or straightedge on the benchmark high spot and slowly rotate the level around the floor you ll discover both low and high spots.
Then vacuum the floor with a wet dry vac or sweep it with a broom.
We re repairing an existing floor that will receive floor tile.
Make a final check with the level to be sure all the high and low spots are gone.
If the floor has more than one low spot move the straightedge around the floor and mark the spots with a pencil.
Such as a straight two by four.
If you do it you ll save lots of time and your concrete floor leveling will be ver.
Check the container for the setting time it s usually between 12 and 24 hours.
Let the leveling compound set before painting or covering the floor.
Before you install file flooring follow the directions above for fixing high spots and low spots in a wood or concrete subfloor.
Many contractors use a 6 foot level or accurate straightedge to help them locate high and low spots in a subfloor.
His crew puts water on the floor to find the high spots.
No matter if you are working with wood subfloors or concrete subfloors you need to check the floor in advance to determine the low spots.
High areas in the floor are called heaves and low areas are called dips if you don t have any marbles handy you can check for dips and heaves with an eight foot carpenter s level.
Lowell brakey a kansas concrete contractor has developed a slick way of doing this.
You can check your concrete floor leveling with dewalt laser level tool.
In a previous video post we showed you how to fix the high spots before installing laminate flooring.
How to fix a low spot in my concrete.